Boilers
Post Date: Fri Oct 12 00:00:00 PDT 2007 Expiry date: Sat Oct 11 00:00:00 PDT 2008 From: [RU] Detailed Buying Lead DescriptionRequirements to Suppler.
� Turn key project implementation
� Experience in turn-key boiler equipment installation (please send us reference list and timing for realization of similar equipment);
� Have all necessary licenses and permissions for performing such activities in EU or CIS (incl. Russia).
Requirements to boiler equipment.
� Boiler should be fueled by degasification methane with concentration 30-96%. Calculation should be performed for 150-250 cub. m./h of pure methane (500-900 cub m./h of gas mixture).
� Temperature graphic of hot water 70-95
� Noxious agent concentration of the exhaust gas from boiler chimney to atmosphere should meet the sanitary code demands.
� Running regime automatic boiler-plant (without operating personal) with possibility to transfer data to PC.
� Boiler plant should be fulfilled in modular implementation and should comprise:
- Gas treatment equipment;
- Burner equipment with automatic methane feeding regulation;
- Pumping equipment and pipeworks;
- Electric power supply equipment and panels;
- instrumentation and automated control systems;
- thermal insulation inside the container.
Delivery DDU (Kemerovo, Russia) Incoterms 2000.
Installation works include: assembling of modular boiler plant, installation of instrumentation and automated control systems and its check-out works, commissioning work.


想在第一时间得到最新的海外求购信息吗?